About the Post

Author Information

Huron East expresses concern with ice throw, transmission line route

Susan Hundertmark — The Mitchell Advocate — April 16, 2012

Council writes letter after reviewing construction and design reports from St. Columban Energy

Concerns about industrial wind turbine setbacks, ice throw and the proposed route for the transmission line will be included in a letter from Huron East council to St. Columban Energy LP, council decided at its April 3 meeting.

Clerk-Administrator Brad Knight told councillors that a staff review of St. Columban Energy’s Construction Report and Design/Operations Report brought up concerns about turbines 9 and 10, whose road allowance setbacks were both less than 100 metres.

Link to full article in the Mitchell Advocate

Tags: , , , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: